Environmental extended site closure checklist
Before shutting down your site, please check the following:
- Are sediment basins flocculated/tested and emptied?
Yes | No | Not Verified | Not Applicable - Are sediment fences/geofabric (etc) and other controls checked and fully functional?
Yes | No | Not Verified | Not Applicable - Are upslope diversion drains, sediment fences/geofabric (etc) and other controls checked and fully functional for restarting?
Yes | No | Not Verified | Not Applicable - Are fuels/oils/chemicals stored in bunded and covered areas and away from drainage lines?
Yes | No | Not Verified | Not Applicable - Are pumps, gypsum, gravel bags, spill kits and other erosion control materials available?
Yes | No | Not Verified | Not Applicable - Are the project spill kits ready if needed?
Yes | No | Not Verified | Not Applicable - Are waste and resource re-use management procedures in place and waste receptacles available for use?
Yes | No | Not Verified | Not Applicable - Is there a project monitoring/inspection program established and agreed for out of hours weather emergencies?
Yes | No | Not Verified | Not Applicable - Have erodible areas been stabilised or covered where reasonably practical?
Yes | No | Not Verified | Not Applicable - Have all ESCPs been reviewed and updated as necessary, to cater for an extended construction shut-down period?
Yes | No | Not Verified | Not Applicable - If there are dewatering requirements over the break, has a relief team to manage environmental risks been identified and trained (including permit issuing, water testing and other relevant skills)?
Yes | No | Not Verified | Not Applicable - Have increased controls been implemented in proximity to high environmentally sensitive areas, such as waterways including temporary works in/alongside waterways?
Yes | No | Not Verified | Not Applicable - Are measures in place to receive and address complaints raised during the construction shut down period?
Yes | No | Not Verified | Not Applicable - Has all equipment maintenance and/or setting changes been carried out to avoid pollution? E.g., Is there a risk that ablutions will overflow, and as such, do they need turning off? Or do generators need to be turned off, particularly at night.
Yes | No | Not Verified | Not Applicable - Have appropriate levels of security been implemented, such as fencing around public risk areas, improved fencing at environmental No-Go zones, heritage protection areas and hazardous substances storage areas?
Yes | No | Not Verified | Not Applicable